SGT 200 Tornado Gas Turbine Package 6.44 MW, first operation 1995

No longer available

SGT 200 Tornado Gas Turbine Package 6.44 MW, first operation 1995

Poeldijk, Netherlands

Description

SGT 200 Tornado Gas Turbine 6.44 MW, first operation 1995 This SGT 200 was installed in 1995 to provide power and heat. The turbine has been under a Siemens level 3 maintenance contract until 2005 and in 2006 the Gas Generator and Power Turbine were overhauled by Siemens. We have access to all the Manuals and maintenance history of the plant. contract.

Generator has been sold and control system has been re-used to support another SGT200.

Specifications

ManufacturerGEC Alsthom
ConditionUsed