Our goal is to reduce the cost of ownership for the owner/ operator by not changing parts when they are ‘expired’ on an hourly basis, but rather, to monitor, inspect and potentially repair these parts to extend the service life. Ofcourse this is not only based on failure of said components, but in cooperation with the client, we also look at when the next ‘service stop’ for the required maintenance on the turbine is possible, and if the components can potentially cover the timespan to that service stop.
Used Core Engine, SGT 200 (Tornado) natural gas fired
Core Engine, SGT 200 (Tornado) natural gas fired, Non DLE, 6.44 MW (in overhaul)
Used Allen Gears Gearbox for SGT 200
Allen Gears Gearbox for SGT 200, 50 Hz, new internals, part nr. : 64/63001237/1
Used SGT100 DLE, 4,9 MW
SGT100 DLE, 4.9 MW, dual fuel, low hours at part load
  • Year: 1996
Used SGT 200 Tornado Gas Core Engine only, 6.44 MW, first operation 1995
SGT 200 Tornado Gas Generator and Power Turbine 6.44 MW, Overhauled by Siemens in 2006, ran 1200 ...
  • Manufacturer turbine: EGT
  • Type of turbine: SGT 200
Used Siemens SGT 100 DLE / Typhoon / 4.9 MW
Power Generation SGT100 DLE for sale (Single shaft) Unit was originally installed in 1995, stop...
Graphite rings for interstage bleed valve
Brand new graphite tripple seal rings for the interstage blow off valve SGT100, SGT400
Refurbished Siemens SGT 100 DLE - 1S
NDT tested and re-coated rotor, SGT100
Refurbished SGT100 DLE LP vanes
SGT100 DLE set of LP vanes, heat treatment, new coating and new abradable coating, overhauled to ...
Refurbished Siemens SGT100 DLE 1S - 2S
SGT100 - 2S carrier ring, also used on various 1S SGT100's as an upgrade.
Refurbished Siemens SGT 100 DLE - 1S
SGT100 DLE, combustion liners, overhauled to 0 hours.
Refurbished SGT 100 DLE combustion liners
Set of SGT100 DLE combustion liners, re coated annd overhauled to 0 hours.
Refurbished Siemens SGT 100 DLE - 1S
SGT100 DLE HP vanes, full set, heat treated, re-coated and in 0 hour condition